Airport Support Facilities at San Diego International Airport

  • Location:

    San Diego, CA

  • Client:

    San Diego County Regional Airport Authority

  • Construction Value:

    $164,500,000

  • Delivery Method:

    Progressive Design Build

  • Year Completed:

    2021

  • Specialties:

    Aviation

Features & Highlights

  • Four buildings across three separate sites across SAN
  • 3.2-million-gallon underground stormwater containment cistern
  • All buildings delivered as a minimum LEED Gold, with the FMD Administration Building as LEED Platinum.
  • All buildings delivered as Zero-Net-Carbon (pending Airport submittal).
Project Overview

For the Airport Support Facilities at San Diego International Airport, Sundt upgraded and consolidated operations from several existing buildings and relocated several airport operations away This was the first step in SAN’s Airport Development Plan.

Sundt constructed four new buildings and a 3.2-million-gallon underground stormwater containment cistern over the span of two years. The project required precise scheduling and coordination by the team since the work was spread across three separate sites and separated by an active runway.

The 3.2-million-gallon underground stormwater containment cistern was built and designed to capture runoff from nearly 80 acres of airport property. Sundt’s concrete team went through more than eight months of pre-planning to meet the high technical requirements for concrete material and its performance for constructing the cistern. The team had to cool the concrete down by 25 degrees F, which was only possible by injecting nitrogen into the mix. The ASF project team cooled the concrete on-site with two cooling stations near an active runway. The team mixed enough nitrogen-cooled concrete to fill an entire Olympic swimming pool. The cistern annually will capture and reuse approximately 16 million gallons of water. The reused water is used to wash cars at the car rental center.

The team constructed a 71,054-square foot Facilities Management Department (FMD) campus north of the runway. It consisted of an 11,346-square foot, state-of-the-art administration building with offices, conference rooms, a training room that serves as a backup emergency operations center, and a 59,708-square foot maintenance shop, warehouse and provisioning building. Additionally, on the northside, Sundt built a 6,742-square foot Airline Fueling Operations building housing administration spaces for the airline consortium’s fueling operator and maintenance bays for the airline fuel trucks. Sundt built an 83,922-square-foot Airline Support Building south of the runway that houses offices, maintenance and provisioning, and belly cargo spaces for multiple airlines. Tenant improvement buildouts were also completed within this building for United, Delta and American Airlines.

» Read More» Read Less

Contacts

Awards & Accolades

AGC Build America Award – Design-Build Building 

2023

Industrial Environmental Association 2020 Environmental Excellence Award, Stormwater Cistern 

2021

California Stormwater Quality Association Outstanding BMP Implementation Project or Stormwater Cistern

2021

AGC Build San Diego Merit Award

2021

Industrial Environmental Association Environmental Excellence Award, Excellence in Greenhouse Gas Management

2020