Prestige Assisted Living at Manteca

  • Location:

    Manteca, California

  • Client:

    Prestige Care, Inc.

  • Construction Value:

    $10,990,000

  • Delivery Method:

    CMAR

  • Year Completed:

    2008

  • Specialties:

    Senior Living

Features & Highlights

  • Project completed 5% under budget and five weeks ahead of schedule
  • Collaborative design and construction process with early involvement from key trades
Project Overview

Sundt allowed the client to explore multiple building scenarios during the planning phase, and we completed the project ahead of schedule and below budget. This 85,933-square-foot community offers a choice of 114 villa apartments including a variety of studio, one-bedroom, two-bedroom and memory care units. Every villa has its own kitchenette equipped with a refrigerator and microwave oven, a private bath with barrier-free shower and 24-hour emergency call system. The exterior grounds include a variety of walking paths and sitting areas within the private courtyard and patio. Many of the first-floor villas have their own patio and the second-floor villas enjoy a balcony.

The project’s timeline was already condensed, but Sundt was tasked with accelerating its schedule so the facility could open early to outpace another facility that started construction before Prestige.  In addition, the owner needed a Sales and Marketing trailer, parking lots, and model units finished in advance in order to begin selling units. Sundt was able to accelerate the schedule by six weeks so that Prestige could open early. The entire facility was built in just 11 months.

In order to accomplish their aggressive schedule and have a successful and enjoyable project, Prestige chose the construction manager at risk delivery method to facilitate a collaborative design and construction process. This also allowed Sundt to be involved in the design phase, which helped ensure the project design and budget remained in alignment. In addition, design-build delivery was utilized for the mechanical, plumbing and electrical scopes to gain early involvement and input from the subcontractors of these critical trades.

» Read More» Read Less
“We were very pleased with the preconstruction services performed by Sundt. The process allowed the owner, architect and contractor all to clarify, adjust and finalize the design and confirm the final construction budget. Plus, we were able to track a variety of potential design options while clearly understanding the quality and cost impacts.”

Tom Vasilatos, Manager, Prestige Assisted Living at Manteca

Contacts

Awards & Accolades

2009 Outstanding Achievement Award General Building to Recognize Excellence in Engineering, Design and Construction, Western Council of Construction Consumers