Water & Wastewater Treatment

THE MOST VITAL INFRASTRUCTURE

Reliable drinking water and wastewater treatment are vital to both public and private users.

Whether expanding or improving facilities, or constructing new ones, we provide cost certainty and minimal disruptions to operations. Our value engineering and constructability recommendations maximize construction dollars for rate-payers. We find ways to expedite schedules to deliver capacity sooner. Also, specialty treatment equipment can cost millions and require long lead times and special design considerations. Sundt offers guidance on these critical decisions and ensures that long-term reliability and life-cycle costs are part of the equation.

STAYING AT THE FOREFRONT

Since 1950, Sundt has been a trusted builder for water and wastewater treatment, with more than 60 plants in the last 15 years alone. 

Our first wastewater treatment plant incorporated non-potable irrigation reuse. Today, we remain at the forefront of treatment technologies, delivering advanced water treatment facilities for indirect potable reuse and zero liquid discharge (ZLD). Our collaborative approach to project delivery is based on meeting client needs, including options for CMAR, Design-Build, and CM/GC delivery. We have experience with several advanced technologies, including:

  • filtration
  • membrane treatment (including reverse osmosis)
  • desalination
  • advanced oxidation
  • brine recovery
  • zero liquid discharge (ZLD)

Sundt has the experience and vendor/equipment relationships to give you the right results.

 

#51

ENR Top 100 CMAR Firms, 2024

$7.7 BILLION

In water and wastewater treatment construction in the past decade

#3

ENR Top Contractor in Wastewater Treatment Plants

#43

ENR Top 100 Design-Build Firms, 2024

SELF-PERFORM EXPERTS

Our in-house capabilities are strategically aligned with critical construction milestones for water/wastewater projects, allowing us increased control over cost, schedule, quality and safety. Our self-perform capabilities, including concrete, heavy civil, steel, piping, electrical, mechanical and for some projects, offsite fabrication, maximize project efficiency.

AHEAD OF THE CURVE

Our experts have extensive experience constructing and commissioning water and wastewater treatment systems that utilize the latest technologies and processes, including physical, biological, chemical, and thermal treatment methods.

Sundt’s use of Power BI (Business Intelligence) and the latest VDC tools improve safety and quality while creating an efficient design and build process that increases the impact of value engineering and constructability reviews.  These tools track real time spending and labor updates, which are all viewable directly by the project team, including the client. This delivers a client experience that facilitates and streamlines operational input and transparency throughout the lifecycle of a project.

Select Honors
AGC Build Arizona Award

Northwest Water and Wastewater Master Plan Package 3A
New Construction, Public, Over $50 Million
2023

Envision Gold Award, Sustainable Infrastructure

SFPUC Headworks Project 
2019

ENR Southwest Best Project Award

Ocotillo Water Reclamation Facility
Water/Environment category
2018

Arizona Water Association Water Treatment Plant Project of the Year

Santan Vista Water Treatment Plant
2018

American Public Works Association Project of the Year

Santan Vista Water Treatment Plant
Arizona Chapter
2018

ENR Southwest Best Project Award

Val Vista Water Treatment Plant GAC Implementation Project
2012

 

Market Leaders